analytics

Design-Build | Fromm

Fromm page header banner for "Design-Build Service" featuring the Fromm chevron and lightning bolt mark on a dark charcoal background with a subtle gold-gray diagonal accent.


  • Streamline project management to a single source
  • Decrease project costs through collaboration
  • Minimize your risk as an owner
  • Deliver projects more quickly and at a higher quality

Two people marking up electrical construction drawings on a worktable during a project planning session





Electrical Design-Build Support Services

Demand for design-build has grown over the last decade as owners look to streamline projects to increase efficiency while lowering costs and minimizing risk.


Early Involvement That Lowers Installed Cost

Fromm’s Design-Build team provides a single source of accountability from the preliminary design phase to the construction phase of your project. We take the burden off of you by coordinating, building budgets, and providing the information you need to achieve the end result you’re looking for on your project. Our team approach also allows for greater flexibility in design, value-engineering considerations, and higher overall value.

 

Our seasoned team consists of experienced professionals capable of working with you on:


  • Electrical design and integration
  • Lighting, lighting controls, and switch gear design
  • Energy efficiency
  • Capturing available utility rebate dollars
  • Cost analysis
  • Parts acquisition
  • Project management
  • Negotiating with suppliers
  • Appliances

Contact Fromm today!